Burrinjuck Power Station Metal compact boring
  • Burringjuck Station
    Portable Borer for Main Inlet Valve
  • Turbine refurbishment
  • Australia
BMU Quay Quarter Tower Sydney Australia v2
  • Quay Quarter Tower
  • Building Maintenance Units
  • Australia
  • Pioneer Generation Wind Farm
  • Turbine refurbishment
  • Mt Stuart, NZ
  • Ohau Dam
    2016-17 Crane upgrade
  • Maintenance, Repair & Overhaul
  • Mckenzie Basin, NZ
  • Mcmillian Civil, Drill Rig Components
  • Contract Manufacturing
  • Christchurch, NZ
  • Contact Energy
    2022 Crane Re-roping
  • Maintenance, Repair & Overhaul
  • Clyde, NZ
  • Contact Energy, 2014
    Machining & Refurb of G1 Gen Unit
  • Maintenance, Repair & Overhaul
  • Clyde, NZ
  • Meridian Energy, 2011 Draft Tube
  • Maintenance, Repair & Overhaul
  • Ohau A, NZ
  • Oceania Gold Mine
    Replica Trunnion Machining
  • Maintenance, Repair & Overhaul
  • Macraes, NZ
  • Pioneer Generation, 2009-10
    Talla Burn 2.1 Meg Hydro Gen Unit
  • Maintenance, Repair & Overhaul
  • Beaumont, NZ
  • Meridian, Spring packs
  • Contract Manufacturing
  • Benmore, NZ
  • Meridian Energy, 2003 Major Overhaul of One Generation Unit
  • Maintenance, Repair & Overhaul
  • Tekapo, NZ
  • Pioneer Generation Wind Farm
  • Turbine refurbishment
  • Horseshoe Bend, Roxburgh, NZ
  • Oceania Gold Mine
    Shutdowns & Equipment
  • Maintenance, Repair & Overhaul
  • Macraes, NZ
  • Manawa Wind Farm
    Gearbox overhaul
  • Maintenance, Repair & Overhaul
  • Mihinerangi, NZ
  • Manawa Energy
    Generator Valve Repair
  • Maintenance, Repair & Overhaul
  • Waipori, NZ
  • ESCO
    Machining Forestry Subassemblies
  • Contract Manufacturing
  • Rotorua, NZ
  • Meridian Energy,
    2011 AC1 Replacement
  • Maintenance, Repair & Overhaul
  • Manapouri, NZ